CPR & Flame Performance
Fixed cables in EU buildings need a declared fire classification under CPR EN 50575 — we design flame-retardant and low-smoke solutions and confirm the achievable classification per project scope to be confirmed.
Industries
Main contractors and M&E buyers order cable in project waves — feeders first, then risers, then final fit-out — and late delivery costs money. TongYuan supplies armoured feeder cable, control cable and site-grade rubber to EN 50525 and BS specifications, with CPR documentation support for the EU market where in scope. Project quantities are produced and shipped by phase, aligned to your programme.
Challenges We Solve
Fixed cables in EU buildings need a declared fire classification under CPR EN 50575 — we design flame-retardant and low-smoke solutions and confirm the achievable classification per project scope to be confirmed.
UK and Commonwealth projects are wired to BS 5467 / BS 6724 — SWA armoured and LSZH-sheath designs are produced to the dimensional and test requirements of the British standards.
Cable should arrive when the trade needs it, not months before — phased production and shipping keep site storage low and programme penalties away.
A single tower order mixes SWA feeders, control cable and final-circuit cord — consolidated sourcing keeps standards, marking and paperwork consistent.
Our Cables for This Industry
Standard series prove the capability — every family can be tailored to your specification and target standard.
SWA armoured feeders to BS 5467 and IEC designs — XLPE insulated, with LSZH options for risers and public areas.
Request this family →Armoured and shielded control cable for building management, fire-alarm and lift systems.
Request this family →YCW/H07RN-F site supply and tool cable that survives abrasion, mud and weather on unfinished sites.
View category →Compliance
The standards buyers in this industry specify most often — dual GB and European designs are available within the same construction.
Field Proof
SWA feeders to BS 5467 for a rail depot build — phased delivery aligned to the electrification programme.
Read case →Case studies from this and other industries are being prepared — ask our sales team for references relevant to your project.
Browse export cases →Request for Quotation
Send the standard, specification or drawing — our engineers revert with a quotation, lead time and certification plan within 48 hours.